Giant Dwarven City Dungeon Set
This is one massive three level dungeon representing a sprawling Dwarven city. It will include a number of feature rooms, including a grand entrance, an eating hall and King's reception, and a large smelting/forge area.
12/03/14
A few quick snaps of the completed dungeon, a more comprehensive gallery to follow post client approval.
10/03/14
6/03/14
Painting WIP:
3/03/14
More photos of finished designs:
26/02/14
All moulds and casting now complete, ready for painting and installation!
08/02/14
Sculpted boiler and furnace. Sculpted ore piles, WIP mine cart. Furnace and ore piles have been moulded, awaiting silicone stock for the rest:
30/01/14
Casting up the fireplaces and lanterns!
Also got gold pigment powder for some gold veins in the mining area.
Also got gold pigment powder for some gold veins in the mining area.
22/01/14
Sculpting of additional pieces underway. Lanterns complete, fireplace/oven WIP:
20/01/14
Further work to be completed (currently underway):
Giant melting pot and other detailing to smithy + OSL
Lanterns + OSL
Mine carts, ore piles, gold veins in stone
Ovens (kitchen)/fireplace(kings bedroom and barracks)
Entrance snow + Shrubbery
Dungeon pen doors/grills (plus jail accessories)
Giant melting pot and other detailing to smithy + OSL
Lanterns + OSL
Mine carts, ore piles, gold veins in stone
Ovens (kitchen)/fireplace(kings bedroom and barracks)
Entrance snow + Shrubbery
Dungeon pen doors/grills (plus jail accessories)
07/01/14
Finished the accessories! I also went through and added a wash to the dungeon to smooth out some of the surfaces and subtly bring the detail out more.
Everything now is pretty much complete. I have a few touch-ups to go through and do, and have also submitted a list of other possible inclusions to the client.
Touch ups yet to complete:
> I missed some of the spoons and fruit on the tables/shelves
> Some of the rocky surfaces are under-defined and need to be brought up to spec with some light highlighting
> touch up the pillows on the kings bed, touch up the water in the baths, some grey is showing through
> a few extra highlights to some of the accessories (eg the books on the shelves need a highlight).
Everything now is pretty much complete. I have a few touch-ups to go through and do, and have also submitted a list of other possible inclusions to the client.
Touch ups yet to complete:
> I missed some of the spoons and fruit on the tables/shelves
> Some of the rocky surfaces are under-defined and need to be brought up to spec with some light highlighting
> touch up the pillows on the kings bed, touch up the water in the baths, some grey is showing through
> a few extra highlights to some of the accessories (eg the books on the shelves need a highlight).
06/01/14
Lava completed
30/12/13
City has been painted, ready to basecoat and paint the accessories now.
23/12/13
Entrance complete, ready to basecoat.
20/12/13
More detailing done on entrance.
18/12/13
WIP Entrance:
13/12/13
Sketches for expanded main entrance proposal:
05/12/13
Progressive photos from the past few days work...
30/11/13
Tiling progressing. Also started laying out some of the accessories to get a feel of how they will look.
29/11/13
Continuing on the tiling...
26/11/13
Had a bit of time to start adding tiles. Added tiles to three rooms:
24/11/13
19/11/13
8/11/13
Finished the brickwork on the top level, completed the first ound of basecoating. A few more gaps to fill and I can basecoat all the sides.
6/11/13
The top level walls are up! Ready for the bricklines to be added...
5/11/13
Scale comparisons of the table bitz I have sculpted, plus a comparison with some of Mirliton's range of table accessories.
Also, I have started on the top level assembly!
Also, I have started on the top level assembly!
30/10/13
27/10/13
Food and kitchen accessories!
23/10/13
Increased the height on all the cave walls to bring it up to the same level as the brick walls. Haven't detailed them yet.
Added secret staircase in.
Some sculpting - hammer for the statues I will be putting in, and the fire pit for the blacksmith/forge area.
Added secret staircase in.
Some sculpting - hammer for the statues I will be putting in, and the fire pit for the blacksmith/forge area.
16/10/13
I have now added all of the brick lines to the walls in the mid level! The walls have now been glued in place and the cutout has been made for the central balcony.
I have also assembled a rather mysterious contraption.....
I have also assembled a rather mysterious contraption.....
9/10/13
Finished detailing and gap filling bottom level walls. Started adding some of the details.
Mid level has been assembled, ready for walls to be detailed.
Mid level has been assembled, ready for walls to be detailed.
12/09/13
Walls complete:
11/09/13
Bottom level has been cut to size and planned out, now to start adding some walls!